How do you prepare a professional drone mission, from the area to the flight file?
Preparing a mission means checking that the flight is allowed there, at that time and in that scenario, then filing in time: read the airspace (SIA zones, NOTAM, SUP AIP), qualify the ground, choose the scenario, declare or report the flight, and gather crew, aircraft and insurance in one flight file.
Where to start: what, where, when, under which scenario?
Everything starts from four written answers, before any map is opened. What: the client's need, turned into shots, trajectories and useful height. Where: the exact flight area, drawn, with the controlled ground area around it. When: a window of dates and hours, never a single date, since filings and weather can move the flight. Under which framework: Open category, or Specific category under a standard scenario (STS-01, STS-02) or an operational authorisation. These four answers decide everything else: which airspace to read, which filings to make, which lead time to meet and which documents to carry.
How do you read the airspace before a flight?
The reference is the aeronautical information published by the SIA (the French aeronautical information service) in the eAIP France. It changes with the AIRAC cycle, every 28 days: a preparation made on an expired cycle can miss a new or modified zone. The structures to find around your area:
- Control zones (CTR) around aerodromes, where prior approval is required depending on height and type of flight;
- Prohibited (P), restricted (R) and danger (D) areas of AIP ENR 5.1: in a P area flying is prohibited, except under its published entry conditions; in an R or D area it requires the approval of the body in charge of the area during its activity hours;
- The RTBA network, military very-low-level training areas, whose activity for the day is published the evening before from 17:00 on the SIA website (AZBA charts);
- Temporary restricted areas (ZRT), published by SUP AIP or NOTAM;
- National parks and nature reserves (AIP ENR 5.7.3) and sites closed to low-level overflight (AIP ENR 5.7.1).
For a first look, the official map « Restrictions UAS catégorie Ouverte et Aéromodélisme » on cartes.gouv.fr shows most of these zones. The DGAC itself states, in its Specific-category guide, that the map « peut contenir des erreurs notamment sur les limites de hauteurs de vol par exemple » (it may contain errors, notably on height limits). The map helps you spot; the AIP decides.
NOTAM and SUP AIP: where do you read them before each flight?
Permanent zones are in the AIP; anything temporary goes through two other channels, published by the SIA:
- The SUP AIP (AIP supplement) publishes long-lasting temporary changes in advance: temporary restricted areas for a military exercise, a major event, an air show;
- The NOTAM publishes short or unforeseen changes: activation of a zone, a restriction around an emergency site, a new obstacle.
Read them on the SIA website, SUP AIP tab, and on SOFIA-Briefing, the SIA's flight preparation service, for NOTAM. No third-party aggregator as a source: during an inspection, only the official information counts. The DGAC is explicit: « La consultation des NOTAM et SUP AIP reste un préalable indispensable à chaque vol » (checking NOTAM and SUP AIP remains an essential prerequisite for every flight). Read them once when preparing, again the day before, and a last time on the day before take-off.
Populated area, assembly of people, third parties: how do you qualify the ground?
In France, a drone flies in a populated area when it flies within a built-up area shown on the SIA aeronautical charts, or less than 50 metres from it, or less than 150 metres from an assembly of people. Both distances are a French definition: each Member State sets its own.
An assembly of people is judged on site and qualified, not counted: it is a crowd dense enough that people cannot move away — a show, a sports event, a beach or tourist site at peak times, a parade. No head count defines it.
Under a standard scenario, the operator sets up a controlled ground area and makes sure no uninvolved person enters it during the flight. Its minimum size depends on the scenario; it grows with height, speed and wind. On a public road, setting it up may require a temporary occupation permit for the public domain.
Height, terrain and obstacles: AGL or AMSL?
A drone's maximum height is measured above the ground or water (AGL): 120 metres under a standard scenario. Airspace limits, however, are published as altitude above mean sea level (AMSL, in feet) or as a flight level (FL). To know whether your flight reaches a zone whose floor is 1,500 ft AMSL, add the terrain elevation to the planned flight height: on a plateau at 400 metres, 120 metres of height puts you at 520 metres, about 1,700 ft AMSL.
Near aerodromes, height limits are counted from the aerodrome's reference elevation, published at the top of the VAC charts and in the AD part of the AIP. Also locate the site's obstacles — power lines, wind turbines, cranes — and allow for terrain rising or falling along the trajectory.
Which filings, with which lead times?
Each filing has its trigger, its lead time and its channel. Those of a Specific-category mission under a standard scenario:
| Filing | When | Lead time | Channel |
|---|---|---|---|
| Declaration to the préfecture | Flight in a populated area | 10 working days, not counting the day of the declaration nor the first day of flights | AlphaTango, or CERFA form no. 15476 sent to the préfecture |
| Flight reported to the Ministère des Armées | Any flight beyond visual line of sight, wherever it is; or an aircraft over 900 g in a military low-level activity area during its hours | At the earliest on D-2 at 04:00, at the latest on day D at 04:00 (Paris time), for a flight starting between 08:00 on day D and 08:00 the next day; 12 hours at most per filing | AlphaTango only |
| Approval in a civil CTR | Visual flight above 50 m over the take-off surface, or any flight beyond visual line of sight | Before the flight | Clearance, the interface the DSNA selected in June 2024 |
| Approval in a military CTR | Any flight | Before the flight | The military unit controlling the CTR |
| Approval near an aerodrome outside a CTR | Flight on the aerodrome premises, beyond visual line of sight, or visual flight above the height limit | Before the flight; a protocol is mandatory for a flight beyond visual line of sight | The aerodrome's air traffic service, failing that its flight information service (AFIS), failing that the aerodrome operator |
| Approval in an active R or D area | Flight in a restricted or danger area during its activity hours (AIP, NOTAM or SUP AIP), RTBA included | Before the flight | The body in charge of the area, named in the AIP; where none is named, flying there is prohibited |
| Night-flight derogation | Night flight outside the conditions of the arrêté | 30 days before operations | Form R5-UAS-DEROG, to the prefect, copy to the regional DSAC; through METEOR when it accompanies an operational authorisation application |
Without an answer from the préfecture, a flight declared in time is deemed authorised; the préfecture may still prohibit or restrict it for security or public-order reasons. The Ministère des Armées does not answer at all. A declaration that misses the 10-working-day notice requires the préfecture's prior approval. The AlphaTango procedure itself is covered in our AlphaTango guide.
Which weather, and which limits?
Two ceilings apply, and the lower one wins: the manufacturer's limits (maximum wind, temperature, rain) and those your MANEX sets for this type of mission. Take the forecast when preparing, then the observation on the day, from official sources: Météo-France and its aviation service, which publishes aerodrome METAR and TAF. Check sunset time too: in mainland France the aeronautical night begins 30 minutes after sunset, and night flying follows its own conditions.
Crew, aircraft, insurance: who flies with what?
- Remote pilot: designated for the flight, listed in the MANEX and holding the certificates valid for the scenario;
- Aircraft: registered where required, of the class the scenario demands (C5 for STS-01, C6 for STS-02) with its declaration of conformity, and airworthy;
- Insurance: valid third-party liability covering the planned activity — see the check to make before each mission;
- Roles: when the flight needs several people (observer, perimeter security), each knows their role before arriving on site.
What goes into a flight file, and the pre-take-off checklist?
The « flight file » is not a document the regulation names. It gathers what the DGAC requires the operator to have checked before any flight, and what must be shown on site during an inspection (DGAC Specific-category guide, §22):
- The UAS operator information statement issued less than 24 months ago;
- The aircraft's class declaration of conformity;
- The up-to-date MANEX;
- For each remote pilot: an identity document and their training records;
- The approvals obtained to fly in restricted airspace, and the protocols where applicable;
- Any other authorisation issued by the DGAC for the mission.
Add what helps the team on the ground: the map of the area and of the controlled ground area, proof that the filings were made, the weather taken, the emergency plan. The pre-take-off checklist comes from your MANEX's normal procedures (see what it must contain): aircraft and battery condition, link, clear area, NOTAM re-read, roles confirmed. What an inspector will check is detailed in our DSAC inspection guide.
After the flight: logbooks and occurrence report
The flight is recorded in the aircraft's and the remote pilot's logbooks. The operator keeps records of operations, maintenance, logbooks and occurrence reports for 3 years. An incident affecting safety is reported to the competent regional DSAC with the CRESUS occurrence report form; beyond the mandatory cases, the DGAC encourages voluntary reports.
What Dronops automates
Frequently asked questions
How far ahead should a mission be prepared?
Do you need approval to fly near an airport?
Where do you find NOTAM for a drone flight?
Is a flight file mandatory?
- SIA — eAIP France, SUP AIP and AZBA charts (in French)
- SIA — SOFIA-Briefing (NOTAM)
- DGAC — Specific-category guide, edition 2 version 1.1 (§16.2, §16.4, §19.1, §19.3, §19.5, §19.6, §20.1, §21.2, §22), in French
- Arrêté of 3 December 2020 on the use of airspace by unmanned aircraft (Légifrance, in French)
- DSNA — drone flight approval contract notice, 20 June 2024 (in French)
- Géoportail — map « Restrictions UAS catégorie Ouverte et Aéromodélisme »
Informational content — it does not replace the official texts in force (DGAC, EASA, AlphaTango). Always check the regulation applicable to your operation.